| No. Transaksi | Pelanggan | Alat | Periode | Hari | Total | Pembayaran | Status | Aksi |
|---|---|---|---|---|---|---|---|---|
| TRX-2024-005 | PT. Hutama Karya | AB-004 - Wheel Loader WA380 | 01/05/2024 s/d 31/07/2024 | 92 | Rp 276.000.000 | DP | Dijadwalkan | |
| TRX-2024-004 | PT. Waskita Karya Tbk | AB-002 - Excavator PC300 | 01/04/2024 s/d 30/09/2024 | 183 | Rp 915.000.000 | Belum Bayar | Berjalan | |
| TRX-2024-003 | PT. Pembangunan Perumahan | AB-007 - Crane CKE2500 | 01/03/2024 s/d 30/06/2024 | 122 | Rp 976.000.000 | Belum Bayar | Berjalan | |
| TRX-2024-002 | PT. Adhi Karya Tbk | AB-003 - Bulldozer D65 | 01/02/2024 s/d 30/04/2024 | 89 | Rp 356.000.000 | DP | Selesai | |
| TRX-2024-001 | PT. Wijaya Karya Tbk | AB-001 - Excavator PC200 | 15/01/2024 s/d 15/03/2024 | 60 | Rp 210.000.000 | DP | Selesai |