Total Jam Operasi Bulan Ini
0.00 Jam
Rata-rata per Hari
0.00 Jam
Total Entri Bulan Ini
0
| Tanggal | Alat Berat | Transaksi | Jam Mulai | Jam Selesai | Total Jam | Meter | Operator | Cuaca | Aksi |
|---|---|---|---|---|---|---|---|---|---|
| 01/03/2024 | AB-007 - Crane CKE2500 | TRX-2024-003 | 08:00 | 17:00 | 9.00 Jam | 1,230.0 → 1,239.0 | Gunawan | Cerah | |
| 02/02/2024 | AB-003 - Bulldozer D65 | TRX-2024-002 | 06:30 | 16:30 | 10.00 Jam | 6,789.0 → 6,799.0 | Cahyo Widodo | Cerah | |
| 01/02/2024 | AB-003 - Bulldozer D65 | TRX-2024-002 | 06:30 | 15:30 | 9.00 Jam | 6,780.0 → 6,789.0 | Cahyo Widodo | Berawan | |
| 16/01/2024 | AB-001 - Excavator PC200 | TRX-2024-001 | 07:00 | 17:00 | 10.00 Jam | 4,529.5 → 4,539.5 | Ahmad Suryadi | Cerah | |
| 15/01/2024 | AB-001 - Excavator PC200 | TRX-2024-001 | 07:00 | 16:00 | 9.00 Jam | 4,520.5 → 4,529.5 | Ahmad Suryadi | Cerah |